电站取水口复杂冲沙廊道系统运行方式优化的试验研究——以大渡河龙头石水电站为例

Experimental Investigation on Operation Scheme Optimization of Complex Sand-flushing System of Intake

作者:刘达(四川大学 水力学与山区河流开发保护国家重点实验室;广东省水利水电科学研究院;广东省水动力学应用研究重点实验室);李连侠(四川大学 水力学与山区河流开发保护国家重点实验室);黄本胜(广东省水利水电科学研究院;广东省水动力学应用研究重点实验室);廖华胜(四川大学 水力学与山区河流开发保护国家重点实验室);张延忠(河北省水利水电第二勘测设计院)

Author:Liu Da(State Key Lab. of Hydraulics and Mountain River Eng., Sichuan Univ.;Guangdong Research Inst. of Water Resources and Hydropower;Guangdong Key Lab. of Hydrodynamic Research);Li Lianxia(State Key Lab. of Hydraulics and Mountain River Eng., Sichuan Univ.);Huang Bensheng(Guangdong Research Inst. of Water Resources and Hydropower;Guangdong Key Lab. of Hydrodynamic Research);Liao Huasheng(State Key Lab. of Hydraulics and Mountain River Eng., Sichuan Univ.);Zhang Yanzhong(Hebei Provincial Water Conservancy and Hydropower Survey and Design Inst. of the Second)

收稿日期:2011-09-07          年卷(期)页码:2012,44(2):16-20

期刊名称:工程科学与技术

Journal Name:Advanced Engineering Sciences

关键字:水力学;复杂冲沙廊道;排沙漏斗;动床试验;运行方式;压力

Key words:hydraulics;complex sand-flushing;scour funnel;movable-bed model;operation scheme;pressure

基金项目:国家自然科学基金资助项目(51079091);教育部博士点新教师基金资助项目( 20090181120013)

中文摘要

电站取水口复杂冲沙廊道系统的冲沙孔孔前漏斗范围往往随冲沙流量增加而增大,但相应地,冲沙孔与廊道连接过渡段的压力则迅速减小,并出现较大负压,简单的调度运行方式很难使压力特性及冲沙漏斗范围达到均佳,必须进行调度方式的优化研究才能达到两者均佳的目的。结合大渡河龙头石水电站取水口复杂冲沙廊道系统的模型试验,通过对复杂冲沙系统冲沙孔组合运行方式的优化调度研究,在不改变冲沙孔孔口尺寸及冲沙廊道系统布置方案的基础上,采用4#冲沙孔全开+3#冲沙孔局开1/2的运行方式使孔前冲沙漏斗、输沙管道压力特性达到了均佳的目标。研究成果对类似布置的取水口冲沙系统的运行方式拟定有重要工程价值和经济效益。

英文摘要

Complex sand-flushing system results in the disproportion of discharge through each outlet and the disparity of each funnel range.Simultaneously,hydraulic characteristics in connection part between sand-discharging outlet and the gallery is very complicated.Therefore,it is very difficult to achieve wide funnel range and good pressure characteristic by the simple operation schemes while keeping the form of sand-flushing structure. Based on hydraulic model test of sand-flushing system in the intakes of Longtoushi hydropower station in Dadu River,operation schemes were studied by physical models.The results revealed that the funnel range can be wide and pressure characteristic be good by means of changing operation scheme of the sand flushing system,which has important engineering and economic impacts for designing operation scheme of similar sand-flushing system of water intake.